Climate Change
Perspectives on climate challenges
Equality
Ideas advancing social equity and inclusion
Governance
Insights on ethical leadership
Steward Leadership
Leadership focused on long-term responsibility
Sustainability
Practices supporting environmental balance
Articles
Insights, perspectives, and thought leadership
Multimedia
Videos, podcasts, and visual storytelling
Courses
Interactive learning and skill development
Events
Conversations, webinars and community sessions
Browse Content
Articles by Topic
Share your ideas or create courses for the community.
Discussion
Share ideas and join community conversations
Networks
Projects and initiatives creating global change
Contributors
Meet the people behind the ideas
AWARDS & FELLOWSHIPS
Steward Leadership 25
Annual award honoring 25 steward leadership solutions
The People & Planet Prize
Visual storytelling for environmental and societal impact
Create post
Share an article with the community
Create event
Host a webinar or gathering
Create organisation
Set up an organisation profile
Apply for SL25
Submit a Steward Leadership application
Create course
Build a learning experience
Cypark’s pioneering waste-to-energy plant has treated some 251,000 tonnes of municipal waste, turning a mounting disposal problem into renewable power for Malaysian homes.
Dato' Ami Moris
Group Managing Director @ Cypark Resources Berhad
Most of Malaysia’s municipal waste still ends its journey in landfill. As towns grow and consumption rises, that dependence comes at a steep price: methane emissions, contaminated groundwater, persistent odours and the loss of land that could serve future generations.
The problem is set to deepen, with Malaysia’s waste generation projected to rise by 12 per cent by 2035. Simply opening more landfills would only postpone the reckoning rather than solve it. The country needs a way to manage growing volumes of waste while recovering value from what people throw away.
At Ladang Tanah Merah in Negeri Sembilan, Cypark is rewriting where that journey ends. Its Solid Waste Modular Advanced Recovery and Treatment System, known as SMART, brings waste segregation, controlled combustion, energy recovery and leachate treatment together in one facility.
Municipal waste arriving from Port Dickson, Seremban and Nilai is first sorted before the remaining material is converted into energy using high-efficiency Japanese combustion technology. Distributed control and automated combustion systems respond to variations in the waste stream, helping the plant generate electricity reliably while keeping emissions below regulatory thresholds.
The facility can process up to 650 tonnes of waste a day and generate as much as 15MW of renewable electricity for the national grid. Material that remains after combustion is not automatically discarded. Bottom ash is repurposed for landfill cover and road maintenance, extending the value recovered from each load.
Cypark has also built commercial durability into the model. A 25-year government concession combines tipping fees for treating municipal waste with electricity sales under Malaysia’s Feed-in Tariff mechanism. In the 2025 financial year, Cypark’s waste management and waste-to-energy segment recorded RM48.1 million in revenue.
The facility can process up to 650 tonnes of waste a day and generate as much as 15MW of renewable electricity for the national grid.
Between January 2024 and January 2026, the plant treated approximately 251,000 tonnes of municipal waste and diverted around half of its incoming waste from landfill. Cypark estimates that this avoided about 504,300 tonnes of carbon dioxide equivalent from landfill emissions, with renewable electricity generation avoiding a further 112,200 tonnes.
At full capacity, the plant can produce enough power for approximately 25,942 households each year. Its significance, however, reaches beyond those homes. By addressing waste and energy within the same system, SMART reduces pressure on land while limiting the pollution risks associated with conventional disposal.
Cypark has paired these environmental gains with community support. More than 400 people have benefited from programmes including festive aid, zakat contributions, assistance for underprivileged groups and support for students and local religious institutions.
The plant also offers Malaysia something it previously lacked: an operational demonstration that municipal waste can become part of a circular resource system rather than remain a growing liability.
Cypark now plans to build on that proof. Over the next one to three years, it intends to optimise the existing plant and implement Phase II, adding 1,008 tonnes of daily processing capacity and raising generation capacity to 22.09MW.
The expansion is being designed around more ambitious goals, including zero waste to landfill, zero toxic discharge and zero wastewater discharge. Cypark is also exploring methane conversion into bioLNG and bioCNG, alongside carbon credits as a possible additional revenue stream.
Over the longer term, it aims to replicate the SMART model through public-private partnerships, supporting Malaysia’s ambition to develop 18 waste-to-energy plants by 2040. The goal is not merely to move waste out of sight, but to change what happens next.
Cypark Resources Berhad pioneered Malaysia's renewable energy industry and has been listed on Bursa Malaysia since 2010, with a longstanding history in environmental services since incorporation. Today, the Group is one of the largest pure-play listed renewable energy companies in Malaysia, with approximately 400 MWp of installed capacity across solar, biogas, and waste-to-energy (WtE). Cypark's pioneering spirit runs deep: the country's first commercial solar farm built on a rehabilitated landfill, its first hybrid solar farm, the largest floating solar farm in Malaysia, and the first grid-connected WtE plant in the country. Backed by end-to-end EPCC muscle across three verticals — Renewable Energy, Circular Waste & WtE, and Sustainable Engineering & Infrastructure — Cypark is delivering national flagship projects, including the 785MWp Kenyir HHFS paired with a 1,190MWh BESS, set to be the largest floating solar installation in Southeast Asia, alongside the 150MWp LSS PETRA 5+ project. The Group is also expanding its WtE capacity, diverting 340,000 MT of waste from landfill annually.
Want to leave a comment? Sign up or log in.
Be the first person to leave a comment!
Sign up or log in now.
Submit an idea, propose a course, or start a conversation that moves the field forward.